About EMS-Trade

One accountable partner integrating Shenzhen electronics manufacturing — boards, assembly, systems, export.

See the factory network

One group, one system.

EMS-Trade is the export brand of a Shenzhen manufacturing network that grew from one PCB workshop in Bao'an into six companies running under a single quality system. We own the boards, the assembly, the power engineering and the export desk — so a hardware buyer in Munich, Austin or Dubai holds one contract, one schedule and one person accountable.

Each sister company was started around a customer problem. Power supplies rugged enough for telecom. Energy storage that switches over in 10 ms. Supercapacitor banks matched to ±5%. Battery backup that hands over in under a millisecond.

Because every plant runs the same ISO 9001-based framework and the same engineering culture, we can deliver depth that a broker between factories cannot fake. When you sign with EMS-Trade, you do not hire one factory — you hire a chain from copper laminate to customs clearance.

One RFQ. One engineering review. One party to hold accountable. That is the whole point.

From one Bao'an workshop to six companies.

Why one partner beats three suppliers.

Vertical depth

From a 1-layer control board to a 58-layer HDI backplane — and from bare copper to a racked cabinet that holds 1,600 kg. Every layer of the build is owned by the same group.

Explore the capabilities

One system

Six companies, one ISO 9001-based framework, one audit cadence. IPC Class 3 acceptance and IATF 16949 automotive coverage run across the whole network — not just one line.

How quality is held

One contract

One RFQ, one engineering review, one supplier to manage. FOB Shenzhen, CIF or DDP terms, an original-only sourcing desk, and a written reply inside 24–48 hours.

Start with a quote
Engineering team at the Bao'an campus reviewing a prototype build

Engineering team, 500+ strong.

More than 500 people run the Bao'an campus — process engineers, program managers, quality staff and operators who, between them, have built more than one factory line from the steel up.

Program managers sit inside the factory, not between factories. When your engineer asks a question, the answer comes from the person who will actually run your build; when a reel of parts arrives late, the person chasing it is the same one who wrote your test plan.

Meet the campus

One network, measured.

9+
SMT lines · 5 DIP
45,000
Bao'an manufacturing campus
38
countries shipped
2GW+
solar capacity in the group

Figures from the group's manufacturing inventory, published by the EMS-Trade export desk. Site-level details on each factory page.

Put one partner to work on your build.

Send a BOM and get engineering feedback and a written quote from the same desk — replies inside 24–48 hours.

Request a quote

Explore capabilities