Industry · Industrial

Built for plants, not shelves.

Industrial electronics manufacturing for controllers, drives, sensors and power stages — wide-temperature part selection, EMC-compliant design review and burn-in before the box is closed. Machines that never stop need supply that never stalls.

Reliability for machines that never stop.

An industrial product is not a consumer product with a fancier case: it lives on a vibrating wall, next to a heat source, for a decade — and when it fails, a line stops. We engineer for that reality: wide-temperature BOM reviews in the DFM pass, EMC and filtering guidance against CE and FCC targets, 48h burn-in on the line, and a BOM control process that keeps every part buildable for the program's life. Ten years later, the same board comes off the same line — that is the product you are actually buying.

Assembly capabilities
Industrial control electronics and power stage on a soft white studio background

Seven things we refuse to compromise.

For every industrial program, these commitments are in the contract — not in the sales deck, and not in small print in the sales deck either.

Wide-temperature part selection — components reviewed and de-rated for extended temperature ranges in the DFM pass, not discovered on the first summerdesign review
EMC-compliant layout and filtering strategy, reviewed against CE and FCC targets before the board is fabricatedCE · FCC
Burning in every unit — 48h aging on the line for the products that must not fail in the field48h burn-in
Spare-parts support — long-lifecycle agreements so the same board, the same screen and the same drive section are still produced years after launchspares
Ruggedization options — conformal coating and potting applied on the same line that assembled the board, documented per unitcoating · potting
Long production lifetime — obsolescence-watched BOM revisions with alternate parts validated before the old ones vanishlifecycle
BOM control — revision lock, change notification and documentation you can audit at any point of the program, with part changes offered to you before they happenv-control

Where the discipline pays off.

Six application families we build for, each with its own board, assembly and enclosure demands — each one a small reference of what the network already ships.

Specify the honest estimate.

Send the BOM and the environment it will live in — temperature, dust, vibration, service life. The engineering desk returns a DFM review and a fixed quote within 24-48 hours, with the burn-in plan spelled out and the spare-parts agreement as a separate, priced line — not a promise you have to chase.

Request a quote Quality gates