A-01
VoltFab — integrated rack power
Group A · PDU, BBU, supercapacitors, CRPS and busway under one quality system
Industry · Group A · seven supplier sites · Shenzhen
The power chain for a rack that draws 132 kW is not a bigger version of the one built for 12 kW. It is re-specified.
01Pain points · what decides the programme
Each figure below is the source's own, carried with its date and its basis.




02Technical requirements · written into the spec
Standard values, quoted with the document they come from rather than a supplier's summary of it.
| Parameter | Value | Basis |
|---|---|---|
| Rack power | 48 V DC, 18 kW standard | Open Rack V3, 30 kW under liquid cooling; 44 OpenU; 1,400 kg rack load. |
| Blind-mate connectors | 100 A power and return | ORV3; 65 A chassis ground for two minutes; 1.5 A presence detect. |
| Rack busbar | 300 / 600 / 1200 / 1400 A | ORV3 rack busbar ratings. |
| Liquid manifolds | 30 kW per rack | Dripless quick disconnects over a 10–60 °C working range. |
| PSU efficiency | 96% at 50% load | 80 PLUS Titanium: 90 / 94 / 96 / 91% at 10 / 20 / 50 / 100% load, power factor 0.95. Ruby raises 50% to 96.5%. |
| Couplers | C13/C14 10 A · C19/C20 16 A | IEC 60320 international ratings, 15 A and 20 A in North America. Current only. |




03Connection layer · what we supply
Every figure on these cards is a published site or product number, not a company statistic.
A-01
Group A · PDU, BBU, supercapacitors, CRPS and busway under one quality system
A-02
Group A · Titanium-class server power for GPU-dense racks, RFQ in 48 hours
A-06
Group A · Cold-aisle containment on their own sheet-metal line; 30 days FOB
A-07
Group A · Helium leak tested one by one, report in the carton
04Trust layer · standards that apply






05Programme archetype · anonymised


06Programme archetype · how to read them



07Execution layer · what to send
A written technical assessment naming the site that would build it, the standards it would be inspected against, and the open questions.



08Start
Rack kW, U height, AC input and destination country.
Default term is FOB, FCA for inland stuffing. The ex-works rule is not quoted. Written assessment from eric@dfshk.cn.
Start · short form
One line is enough to start. An engineer answers, not a chatbot.
We answer from eric@dfshk.cn. If you have a drawing or a spec sheet, reply to that message and attach it.