FEAR-01
The attack is on the record
A competing manufacturer's own testimonial says good communication is where they beat Chinese vendors.
Service 02 · language bridge · engineering documents
When your specification leaves your desk, the question is whether what arrives at the factory is still your specification.
01The fear
FEAR-01
A competing manufacturer's own testimonial says good communication is where they beat Chinese vendors.
FEAR-02
One callout on the drawing and a different one in the purchase order. Nobody notices until the parts are measured.
FEAR-03
Leave the workmanship class unstated and it defaults to whatever the factory uses, not what your product needs.
FEAR-04
A change reaching the line after the panel is etched is a scrapped batch plus a re-quote.
02Deliverable · the bilingual pack
03Why English alone fails
STD-01
The layout and land-pattern documents live here, and they do not define what the factory must accept.
STD-02
Board requirements and bare-board acceptability are two separate documents, and quoting one does not invoke the other.
STD-03
This is the process document — how the joint is made, not how it is judged.
STD-04
The document an inspector works from. Its own text says the user defines the class; the standard will not choose one.
STD-05
Rework has its own document. Writing “rework permitted” without naming it leaves the method to the line.
STD-06
IPC-A-610J §1.1 provides no cross-section or X-ray criteria; BGA void judgement belongs to IPC-7095.
04Mechanism · five steps
STEP 01
Any form is acceptable: a marked-up drawing, an email line, or a revised BOM row.
STEP 02
The factory confirms in writing. A verbal “OK” is not a confirmation.
STEP 03
A component substitution can move the class, and a class change moves assembly cost 20–40%.
STEP 04
Revision pack, query log and purchase order carry one new revision number, so no document is stale.
STEP 05
If the change is yours after release, the revised price is issued in writing first.
05Inputs · what we need from you
IN-01
Your drawing set as it stands today, with the revision letter it carries.
IN-02
Manufacturer part numbers, approved alternates, and anything you will not substitute.
IN-03
The class, the acceptance document and the inspection level for the purchase order.
IN-04
What has already been changed, by whom, and whether the line has been told.
06Where it fits
NEXT-01
The written review that decides which class and document actually apply to your product.
NEXT-02
A 2,000-piece lot samples 125 units; at AQL 2.5 the lot is accepted at 7 major defects.
NEXT-03
Batch traceability from board number to SMT batch, test record and shipping carton.
NEXT-04
The document list that makes a first quotation readable instead of a guess.
No partner factory is named on this page. Naming one would read as an endorsement; every partner is listed on the network pages.
07Start
Send the current revision. We will say what the factory can misread in it, and write the class into the order.
Written technical assessment, from eric@dfshk.cn.
Start · short form
One line is enough to start. An engineer answers, not a chatbot.
We answer from eric@dfshk.cn. If you have a drawing or a spec sheet, reply to that message and attach it.