SVC-01
Sourcing & matching
Is this the factory, or a layer?
Registered entity, production site and bank payee verified as one company.
Deliverable — a written sourcing report
Execution layer · Shenzhen · trading since the early 1990s
You sign with one party. Six lines run on established SOPs, and each one ends in a document you keep.
01Execution layer · six fears
Each line exists because buyers arrive with the same six objections. Every page opens with the objection, not the feature list.
SVC-01
Is this the factory, or a layer?
Registered entity, production site and bank payee verified as one company.
Deliverable — a written sourcing report
SVC-02
Will my drawing arrive intact?
Drawings, BOMs and change notices carried in Chinese by engineers who read them.
Deliverable — a numbered revision pack
SVC-03
Showroom, or a running line?
Invitation letter, itinerary, a bilingual escort on the floor, and a written report.
Deliverable — a written visit report
SVC-04
Can anyone here read their answer?
Every claim mapped to the governing document, and the rest marked.
Deliverable — written assessment and plan
SVC-05
First article fine, batch not?
Sampling to ISO 2859-1 level II; pass or fail gates the balance payment.
Deliverable — a per-batch inspection report
SVC-06
Who owns the paperwork now?
FOB by default, FCA inland; the export declaration stays in our name.
Deliverable — the export document set
02Delivery layer · the artefacts
03Execution layer · the sequence
STEP 01
A drawing, BOM, specification or a photograph of an existing part.
Input — one document is enough to start
STEP 02
A written technical assessment first, and a price after it.
Output — an engineer's reply, not a chatbot's
STEP 03
Identity chain checked before you commit, and the factory quotation shown.
Route — process envelope first, then price
STEP 04
A first article you keep, and a laboratory test you commission if you want one.
Evidence — submitted in your name
STEP 05
Inspected in the factory at AQL 0 / 2.5 / 4.0 before anything ships.
Gate — the report holds the balance payment
STEP 06
Documents, customs and freight, FOB by default and never EXW.
Rule — the declaration stays in our name
04Pricing · what is inside and what is not
COST-01
3–15% across the market, most full-service agencies at 5–10%. Small orders carry the highest percentage.
COST-02
50% mould deposit, refundable after the third order, moulds kept five years with the drawings handed over.
COST-03
30% deposit and 70% before shipment, or an irrevocable letter of credit at sight.
COST-04
The buyer pays the inspection company directly. One pre-shipment day runs $199–320, about 1.5% of a $20,000 order.
We accept no commission, rebate or referral fee from any factory, and that commitment can be written into the contract.
05Before you sign
Q-01
Yes. Most buyers start with technical assessment or sourcing and add the rest once a factory is chosen.
Q-02
We are. The export declaration is issued in our own name as the operating entity.
Q-03
No. The certifications belong to the factories that hold them, and we show you which ones.
Q-04
Send the drawing, BOM or specification. You get a written assessment and an engineer's reply.
06Where it fits
REF-01
Twelve finished-product categories, each with a named site behind it.
REF-02
24 independently operated sites in five capability groups, listed by name.
REF-03
Sampling, traceability and the calibration record that sits behind a batch.
REF-04
The commercial and technical questions we answer most often, in writing.
No partner factory is named on this page. Naming one would read as an endorsement; every partner is listed on the network pages.
07Start
Name the category or attach the drawing. You get a written technical assessment, and a reply from an engineer.
Written technical assessment, from eric@dfshk.cn.
Start · short form
One line is enough to start. An engineer answers, not a chatbot.
We answer from eric@dfshk.cn. If you have a drawing or a spec sheet, reply to that message and attach it.