G-01
How to vet a Chinese electronics supplier
Start here if you have a quotation and no site visit.
AQL 0 / 2.5 / 4.0 · $20,000 order walk-through
Resources · four guides, no gate
Written from the trading-company position, by the people who carry the order. Usable whether or not you ever contact us.
01What this library is for
If a guide tells you to spend money with somebody else — an inspector, a test lab, your own broker — it still says so.
02The four guides
G-01
Start here if you have a quotation and no site visit.
AQL 0 / 2.5 / 4.0 · $20,000 order walk-through
G-02
The file set that makes quotes comparable.
IPC-A-610J Table 1-1, five lifecycle stages
G-03
Your quotation says CIF — what did you actually buy?
In force since 2020-01-01
G-04
What two days can and cannot accomplish.
Audit ladder $220–458 per man-day
03Which guide you need, by situation
04Where the numbers come from
05Free tools on the roadmap
Planned — not live
Enter a lot size, read the sample size and the accept / reject numbers.
Build first · a 2,000 lot returns 125 pieces
Planned — not live
Layers, trace and space, thickness, drill, copper weight, finish.
Build second · across the Group C board sites
Planned — not live
Read a landed cost rather than a unit price, with each measure on its own line.
Build last · third-party rate data moves
All three are roadmap items. No page on this site offers one as a working tool, and no result can be requested today. Roadmap order: AQL calculator, capability sheet, landed-cost estimator.
06Questions this library gets
07Start
The checklists are free and un-gated. The assessment is what an engineer writes back.
Written technical assessment, from eric@dfshk.cn.
Start · short form
One line is enough to start. An engineer answers, not a chatbot.
We answer from eric@dfshk.cn. If you have a drawing or a spec sheet, reply to that message and attach it.