C-02
Whale PCBA — fabrication & assembly
Group C · Publishes ISO 13485:2016 and IATF 16949:2016; free DFM review within 24 hours
Industry · Groups C and D · four supplier sites · Shenzhen
Change one component in year three and somebody has to tell you, then revalidate it. That is the part a supplier's certificate never covers.
01Pain points · what decides the programme
Including one correction, because the most common sentence on a supplier page is also the wrong one.




02Technical requirements · written into the spec
IPC's own rule puts the product-class decision on the user, so it belongs in your purchase order rather than a supplier's brochure.
| Document | What it governs | What it does not cover |
|---|---|---|
| IPC-A-610J | Acceptability, Rev J, March 2024, 430 pp | Its scope excludes cross-section and X-ray criteria, so a visual-only claim is incomplete. |
| J-STD-001J | Soldering process and materials, Rev J, March 2024, 116 pp | Acceptance. A supplier quoting only this document has quoted half a requirement. |
| IPC-6012F | Rigid board qualification and performance | Appearance, which is IPC-A-600M, Rev M, May 2025, 212 pp. |
| IPC-6013F | Flexible and rigid-flex boards, released 25 August 2026 | Rigid-board performance, which stays with 6012. |
| IPC-7711/7721D | Rework and repair, Rev D, December 2023, 286 pp | Some Class 3 joints may not be reworked at all, so agree the disposition path in advance. |
| IPC-7095 | Void judgement on ball-grid and bottom-termination parts | Your specification, which sets the acceptance limit the X-ray is judged against. |




03Connection layer · what we supply
ISO 13485 appears here as a quality management system, never as product approval.
C-02
Group C · Publishes ISO 13485:2016 and IATF 16949:2016; free DFM review within 24 hours
C-03
Group C · So the clinical build and the launch build run on one line
D-17
Group D · Six-station line with 100% powered-on test; MOQ as low as 500 pcs
C-01
Group C · ISO 9001:2015 audited annually by SGS; no MOQ
04Trust layer · standards that apply






05Programme archetype · anonymised



06Programme archetype · how to read them



07Execution layer · what to send
A written assessment covering stackup and DFM, the class decision and its cost, the inspection and test plan, the traceability scheme, and the questions a reviewer would ask.



08Start
Intended use, device class, regulatory pathway and traceability depth.
Default term is FOB, FCA for inland stuffing. The ex-works rule is not quoted. Written assessment from eric@dfshk.cn.
Start · short form
One line is enough to start. An engineer answers, not a chatbot.
We answer from eric@dfshk.cn. If you have a drawing or a spec sheet, reply to that message and attach it.